
September 14, 2013 Updated
JAXA launched the first Epsilon Launch Vehicle (Epsilon-1) with the Spectroscopic Planet Observatory for Recognition of Interaction of Atmosphere (SPRINT-A) onboard at 14:00 on September 14 (Sat.), 2013 (Japan Standard Time, JST) from the Uchinoura Space Center.September 12, 2013 Updated
JAXA would like to announce that we have set the launch date and time of the first Epsilon Launch Vehicle (Epsilon-1) with the Spectroscopic Planet Observatory for Recognition of Interaction of Atmosphere (SPRINT-A) onboard as follows. August 28, 2013 Updated
The Japan Aerospace Exploration Agency is now investigating the cause of an automatic stop alarm issued approximately 19 seconds prior to liftoff during the Epsilon-1 launch countdown operation on August 27, 2013. As we have decided to carefully examine the cause and prudently confirm the measures, it is very difficult for us to set the new launch date within August. August 27, 2013 Updated
The Japan Aerospace Exploration Agency (JAXA) cancelled today’s launch of the first Epsilon Launch Vehicle (Epsilon-1) with the Spectroscopic Planet Observatory for Recognition of Interaction of Atmosphere (SPRINT-A) onboard from the Uchinoura Space Center, because an automatic stop alarm was issued as an attitude abnormality was detected approximately 19 seconds prior to the liftoff time during the automatic countdown sequence. The launch had been originally scheduled for 1:45:00 p.m. today (Japan Standard Time).August 25, 2013 Updated
The launch time of the Epsilon Launch Vehicle with the SPRINT-A (Spectroscopic Planet Observatory for Recognition of Interaction of Atmosphere) was set for 1:45:00 on August 27 (Tue.), 2013 (Japan Standard Time).August 8, 2013 Updated
The Japan Aerospace Exploration Agency (JAXA) decided to postpone the launch of the first Epsilon Launch Vehicle (Epsilon-1) with the Spectroscopic Planet Observatory for Recognition of Interaction of Atmosphere (SPRINT-A) onboard to August 27, 2013, from the Uchinoura Space Center as JAXA has taken extra time to rectify the incompatibility* found in the ground support equipment during the communication function test between the Epsilon-1 and the equipment in the course of launch campaign at the launch site. The launch was originally scheduled for August 22, 2013 from the center.